Plumbing Invoice Australia: What to Put on It and How to Get Paid
What a plumber's invoice must include in Australia: ABN, GST, licence number and deposits, plus why the invoice and compliance certificate go out together.
In this article
A plumber's invoice in Australia needs your business name and ABN, the date, a clear description of the work, labour and materials, and the GST amount. If the job is $1,000 or more, it also needs your customer's name or ABN. Include your licence number, and send your compliance certificate the same day if your state requires one.
That covers the basics. The rest of this guide shows what each part looks like on a real job, how GST works for plumbers, why the invoice and compliance certificate should go out together, and how to get paid without chasing.
What must a plumber's invoice in Australia include?
If you are registered for GST, your invoice is a tax invoice. The ATO sets what it has to show. For a sale under $1,000, it needs to show:
- that it is a tax invoice
- your business name (who you are) and your ABN
- the date it was issued
- a brief description of what you supplied, with quantity and price
- the GST amount, or the words "Total price includes GST" when GST is exactly one-eleventh of the total
- how much of the sale is taxable, if some of it is not
For a sale of $1,000 or more, it must also show your customer's name or their ABN. Most hot water jobs, drainage repairs and bathroom rough-ins are over $1,000, so build every plumbing invoice to the higher standard, and you will never be caught out.
On top of the ATO's list, a good plumbing invoice has:
- Your licence number. Customers, builders, and insurers use it to check that you're licensed. Some regulators require it on advertising (Queensland's QBCC does), so make it a habit to put it on every quote and invoice. Check your state regulator for exactly what applies to you.
- The job address, which is often different from the billing address.
- An invoice number that never repeats, so every invoice is easy to find later.
- Labour shown as hours times rate, with the call-out fee on its own line.
- Materials listed item by item, separate from labour.
- Payment terms and how to pay: due date, bank details or a payment link.
Do plumbers have to charge GST?
You must register for GST once your GST turnover reaches $75,000 or more, and you have 21 days to register after you hit it. The ATO measures this two ways: your turnover for the current month plus the previous 11 months, and your projected turnover for the current month plus the next 11. If either reaches $75,000, you register.
If you are registered, add 10% GST to your prices and issue tax invoices. If you are not registered, do not charge GST and title your document "Invoice", not "Tax Invoice". Most plumbers running a van and billing regularly pass $75,000 quickly, so assume GST unless your accountant has told you otherwise.
A worked plumbing invoice example
This is an illustrative invoice for replacing an electric hot water unit. The numbers are examples only. Your prices and the right line items will differ.
| Item | Detail | Amount (ex GST) |
|---|---|---|
| Supply 250L electric hot water unit | 1 x $980.00 | $980.00 |
| Valves and fittings kit | Tempering valve, PTR valve, flexible hoses, fittings | $146.00 |
| Removal and disposal of old unit | 1 x $45.00 | $45.00 |
| Labour | 3.5 hours x $120.00 | $420.00 |
| Subtotal | $1,591.00 | |
| GST (10%) | $159.10 | |
| Total (inc GST) | $1,750.10 | |
| Less deposit received | $500.00 | |
| Balance due in 7 days | $1,250.10 |
At the top of the invoice, list your business name, ABN and licence number, the invoice number and date, the customer's name and the job address. Because the total is over $1,000, include the customer's name (or ABN, if they are a business). At the bottom, say how to pay and add a note such as "Compliance certificate sent separately" if your state requires one.
Two things to copy from this example. Make the call-out or disposal fee its own line so nobody argues about it later. Also, show the deposit on the invoice so the balance is clear.
Send the invoice and the compliance certificate together
For regulated plumbing work, finishing the job means two documents, not one: the invoice and the compliance certificate. Plumbers often send the invoice and let the certificate slip, or hold the certificate back until the customer pays. Both are mistakes.
- Victoria: a licensed plumber must issue the compliance certificate to the customer and lodge it with the Building and Plumbing Commission (BPC, formerly the VBA) within five days of completing the work. The BPC says a plumber can't withhold a compliance certificate because of late payment or non-payment. Missing the deadline is an offence that can lead to an infringement notice. Chase the money through the invoice, not the certificate.
- NSW: submit the Certificate of Compliance when the work is complete, or before a final inspection if the work needs one, and the plumber must give a copy to the person who arranged the work.
- Other states: the rules and timeframes differ, so check your state regulator.
The simplest habit is to treat the job as not finished until both documents are out. Send the certificate the same day, straight after the invoice goes out, so the customer, the builder and the property manager all have what they need.
What plumbers forget to charge for
Most under-billing is small items that never make it onto the invoice. Before you send, run down this list:
- call-out or travel fee
- after-hours or weekend rate
- fittings, washers, tape, solder, sealant and other consumables
- parts you picked up on the way, with the receipt
- old unit removal and disposal
- second trip for parts or a return visit
- time on the phone or on site quoting variations
Decide how you handle markup on materials and apply it the same way every time. Either show materials at cost plus your markup, or build the markup into a single materials line. Consistency matters more than which you pick.
Payment terms, deposits and getting paid on time
- Set the due date on the invoice. "Payment due in 7 days" gets paid faster than "on receipt" or no date at all.
- Take a deposit on materials-heavy jobs so you don't carry the cost of a hot water unit or a fixture package.
- Invoice the same day. The longer you leave it, the longer you wait.
- Make paying easy. Include bank details and a payment link on the invoice so they can't claim they don't have the details.
- Follow up on a schedule. A polite nudge at 1, 7, 14 and 28 days overdue gets most invoices paid without a hard conversation.
If an invoice is still unpaid after that, our guide on what to do when a customer won't pay covers the next steps.
Plumbing invoice software: what to look for
If you are still building invoices in Word or Excel, an app saves time and prevents missed items. For a one- to five-person plumbing business, look for:
- invoices that are GST-correct and carry your ABN and licence number automatically
- a list of your regular items, so labour and common parts are one tap
- photos and notes from the job attached
- a clear record of what was invoiced, so the paperwork for the job is easy to match up
- deposits and part payments
- automatic reminders when an invoice is overdue
- a link to Xero or your accountant's software
We compare the options in our guide to the best invoice app for tradesmen.
How Korda Pro does plumbing invoices
With Korda Pro, you send a voice note or message about the job, for example, "replaced the hot water unit at 14 Smith Street, 3.5 hours, new unit and fittings". Korda Pro prepares a draft invoice with your ABN, calculated GST, and the listed items. You check it, approve it, and it goes to the customer. If you use Xero, it syncs across. If the customer hasn't paid, Korda Pro follows up on days 1, 7, 14, and 28 overdue with a polite reminder.
You stay in control of every invoice. Nothing is sent until you approve it.
Plumbing invoice FAQs
Does a plumber need an ABN on an invoice?
Yes. If you are registered for GST, your ABN is one of the things a tax invoice must show. Even if you are not registered, put your ABN on every invoice.
Does a plumber have to put their licence number on an invoice?
Rules vary by state, and some regulators focus on advertising, quotes and contracts. Adding your licence number to every invoice is a simple habit that protects you and reassures customers. Check your state regulator for what applies to you.
Can a plumber hold back the compliance certificate until the invoice is paid?
In Victoria, no. The Building and Plumbing Commission (BPC, formerly the VBA) says a plumber can't withhold a compliance certificate because of late payment or non-payment. Other states have their own rules, so check with your regulator before you hold one back.
Do I charge GST if I am a sole trader plumber?
Only if you are registered for GST, which is required once your GST turnover reaches $75,000 or more. Sole traders and companies follow the same rule.
What is the difference between an invoice and a tax invoice?
A tax invoice is an invoice from a GST-registered business that includes the details the ATO requires. If you are not registered for GST, you issue an invoice, not a tax invoice.
How long do I have to give a customer a tax invoice?
If a customer asks for a tax invoice, you have 28 days to provide it. You do not have to provide one for sales of $82.50 or less (including GST) when asked.
Should I list call-out fees and materials separately?
Yes. A separate call-out line, labour (hours times rate), and materials item by item make the invoice easy to check and harder to dispute.
Can I send a plumbing invoice by text or email?
Yes. A digital tax invoice is as valid as a paper one if it has the required details. Send it as a PDF or a link, and keep a copy.
The bottom line
A plumbing invoice that gets paid meets the $1,000 standard, shows the call-out fee, labour, and materials on separate lines, includes your licence number, and goes out the day the job finishes, with the compliance certificate straight after. Then follow up on a schedule, so you are not chasing from memory.